7.1. Inventory of the existing modeling and forecasting practices

7.2. Identification of the information and forecasting products

7.3. Inventory of the availabe real time and historical data to be used for model building

7.4. Planning improvements in the monitoring systems

7.5. Building a real time common Information System, data exchange program and common database

7.6. Review and establishing of the low flow indexes and high flow threshold values for the warning process

7.7. Selection of a hydrological and water polution modeling platform for a real time forecasting

7.8. Creation of a modeling concept, design, calibration, testing and validation of the model

7.9. Design and implementation of the interface with the DESWAT system for hydrological forecast of the RO territories

7.10 implementation of a real time data flows and real time forecasting system

7.11. Design and implementation of the interface for the dissemination of the forecasting products; creation of end-users and stakeholders forum

7.12. FLIWAS decision system planning for the eligible area